Villa Park will be rehabilitating 19 streets beginning on Monday, December 13, 2018 with an estimated completion at the end of January, 2019. Each year the City completes a cycle of street rehabilitation projects in order to maintain the life of the City’s asphalt streets. Locations and asphalt treatment methods are identified by the City Engineer using data from the City’s Pavement Management System, coordination with other underground projects, as well as field observation and reports from residents throughout the year.

The FY 17/18 project will rehabilitate nineteen (19) streets sections. The proposed improvement includes,
- Remove and replace deteriorated pavement sections.
- Crack seal as needed.
- Edge or full grinding of the street pavement.
- Overlay the full pavement section with a minimum 2 inches of rubberized asphalt.
- Slurry certain street sections
For a construction schedule click here.
FY17/18 Villa Park Street Project List
| Street Name | From | To |
| Leigh Cir | Ridgeview Cir | Cul-de-sac |
| Ridgeview Cir | Cul-de-sac | Cul-de-sac |
| Daron | Taft Ave | Cul-de-sac |
| Loma St | Cerro Villa Dr | Valley Dr |
| Valley Dr | Cerro Villa Dr | Loma St |
| Aubrey Cir | Valley Dr | Cul-de-sac |
| Montana Cir | Vida Cir | Cul-de-sac |
| Francisco Dr | Vida Cir | Center Dr |
| Fernando Cir | Laconia Dr | Cul-de-sac |
| Vida Cir | Francisco Dr | Fernando Cir |
| Roberto St | Collins Ave | Fernando Cir |
| Mesa Dr | Mesa Dr/Loma St | Villa Isle Dr |
| Mesa Dr | Villa Isle Dr | Cerro Villa Dr |
| Park Villa Ln/Pl | Villa Park Rd | Cul-de-sac |
| Hidden Valley Dr | Canyon Dr | Cul-de-sac |
| Durfee Cir | Lemon St | Cul-de-sac |
| James Cir | James Rd | Cul-de-sac |
| James Rd | Center Rd | James Cir |
| Christine Cir | James Rd | Cul-de-sac |
Below is the street project list and a map.